We provide a wide range of popular bathroom and toilet renovation packages for HDB flats that can be customized according to your needs. Please check out the packages and pricing we have below or contact us with more details for customized services.
Package 1: Toilet Floor Overlay Package (Popular)
If you want to do a simple renovation for your toilet to improve on the appearance on your existing stained or slippery floor tiles and also change out the toilet bowl and wash basin, this is the package for you.
There is minimal downtime as this type of toilet renovation can be done quickly without any hacking works involved. Overlaying of tiles is HDB approved and is a safe and cost effective method for a brand new look!
Suitable For:
- Most HDB/Condo toilets without any existing leaking issues
Standard Floor Package (HDB)
Premium Floor Package (HDB)
*Pricing is for minimum of 2 toilets. Single toilet only +$100.
**Haulage & disposal of debris charged separately for shower screens, carpentry and others
***Can top up for toilet wash basin with cabinet
Call/Whatsapp Heng at 8818 8896 for a Non Obligatory Discussion!
Package 2: HDB Toilet Floor Package (Hacking)
If the toilet floor has an existing leaking issue, you may need to hack out the toilet floor and redo the waterproofing. There is a downtime of 2-4 days per toilet
Suitable For:
- HDB toilets with existing leaking issues
Standard Floor Package (HDB)
Premium Floor Package (HDB)
*Indicative pricing, please whatsapp photo of existing for accurate pricing (depending on size & if post waterproofing inspection is required).
Call/Whatsapp Heng at 8818 8896 for a Non Obligatory Discussion!
Package 3: HDB Toilet Wall & Floor Package (Overlay)
If you’ll like to have a brand new look for your entire toilet including the wall tiles, we have the package for you. Doing the toilet wall tiles involve removing all fixtures and accessories in the bathroom before re-tiling. It takes about 5 or so working days per toilet, and new accessories have to be purchased. Overlaying of tiles is HDB approved and is a safe and cost effective package for a brand new look!
Suitable For: Most HDB toilets without any existing leaking issues
Please see our rough pricing and job scope as a guide.
Tiling Works
- Supply & Overlay Wall Tiles To Ceiling Height — $1900-$2150 (Depending on Size and Complexity)
- Supply & Overlay Floor Tiles For Toilet — $700 – $800
Plumbing Works
- Supply & Install 01 Set Toilet Bowl & Bidet Spray For Toilet — $320 – $550 (Depending on Model)
- Supply & Install 01 set Wash Basin w/ Tap — $250 – $320 (Depending on Model)
- Supply & Replace Stainless Steel Piping for Toilet — $450 – $800 (Depending on Hot/Cold)
Haulage & Disposal
- Haulage & Disposal of Debris Generated — $250 – $400
Items To Purchase
- Purchase of New Taps / Shower Set & Accessories for Bathroon — $200 to $300 and above
Estimated Cost: $4xxx and up for full wall & floor tiles overlay job
Estimated Turnaround: 5-6 Working Days